久久伊人中文字幕,九九爱爱视频,久久福利影院,精品乱码视频在线,狠狠色丁香婷婷综合久小说久,女同一区二区免费aⅴ,大胆gogo少妇裸体

Hotline: 13511543292     中文版 English
NAVIGATION
CONTACT US
Mobile phone: 13511543292
Fax: 19961839099
Website: m.xrypgs.com
Address: 29 weiliu road, huaiyin district, huaian city, jiangsu province, China
Zip code: 223300
Huaian HuaHe Hydraulic Machinery Co.,LTD.
The design process of power unit is introduced
Add time: 2019/9/17 15:21:15   Click: 876
The design of power unit is an important link that cannot be ignored. Do you know the specific design process? What factors should we pay attention to? First, we need to complete the hydraulic and power system calculation, and to determine the engine model and specifications. Then, according to the calculation results of the hydraulic system and referring to the existing engine products in the product library of various engine manufacturers, select the engine products that meet the demand of power unit size, especially the demand of height.
 
The following is to consider the actual situation, reasonable design of the power unit installation rack and the layout of each component. Generally, according to the structural characteristics of the mounting frame and the engine, the installation of the engine adopts the suspension type, the engine is supported at three points, one of which is supported at the fan end, the other two points are supported by two legs of the transmission box, and the transmission box is connected with the engine flywheel shell. The hydraulic oil pump is connected to the engine flywheel through the coupling of the transfer case for the engine power output.
 
After finishing the layout of each part, it is necessary to make appropriate adjustments and optimize the structural strength of the mounting rack. Such as through each component in the power unit in the mounting bracket arrangement in 3 d modeling, to have a mutual interference between the parts, influence use, not easy to maintain parts position adjustment, especially for the engine cooling system through the adjustment and test of each component can play to their respective functions in the mounting bracket.
 
Normally, after the components are fixed, and then combined with the force of the whole and the parts of force and the vibration of the power unit, the finite element analysis was carried out on the mounting bracket, for some of the stress concentration location is optimized and reinforcement, thus ensuring the intensity of the use of the power unit.
【Return to the previous page】
CONTACT US
Mobile phone: 13511543292
Fax: 19961839099
Website: m.xrypgs.com

Address: 29 weiliu road, huaiyin district, huaian city, jiangsu province, China
Zip code: 223300
Key words: power unithydraulic power unithuaian power unit、huaian hydraulic power unit
All rights reserved: Huaian HuaHe Hydraulic Machinery Co.,LTD.   Website registration no: ICP 16039044-2
讷河市| 深水埗区| 通渭县| 连平县| 新安县| 乌兰县| 咸丰县| 巴林左旗| 调兵山市| 甘谷县| 宜州市| 朝阳区| 项城市| 岳阳市| 乌拉特后旗| 溆浦县| 常山县| 密山市| 肃宁县| 神农架林区| 通渭县| 浦江县| 阿合奇县| 孟村| 嵩明县| 旬阳县| 浑源县| 东城区| 陈巴尔虎旗| 浠水县| 毕节市| 社旗县| 柳林县| 兴安县| 华容县| 太原市| 临清市| 游戏| 嘉禾县| 瑞安市| 洪泽县|